EPEC is very pleased to announce that our screens and peripheral equipment were installed by UCI at the Four Mile Creek WQRF expansion project.
The original Four Mile Creek plant was designed to treat 3.0 MGD of wastewater. To meet the needs of this growing area, the plant was recently upgraded to an average flow of 6 MGD and a peak flow of 12 MGD with the capability to double the flow to 12 MGD average / 24 MGD peak.
The UV retrofit changed out two smaller UV panels (originally installed in 1998) to a single panel per train and rebuilt the old UV vessels. Their system is designed to treat 1 MGD average flow rate and 2 MGD peak flow rate.